-
It started Monday night, just the wiring, next minute.
get a phone call on Tuesday night and well as you see a little working bee. Dave and his Boys came up and Hans and Dion, got a little busy. -
It was only going to be a little bit.
-
Cleaning up the Track from the Club.
-
Rob J, Jan P,Hans and Dion clearing out the remainder of the track. Doug M just missed in the photo busy cleaning up all the wiring.
-
Steve and Dion pulled the old Track that was used for shows out from the Roof, a bit to gone to refurbish.
-
Rob D, Kieran D, Maurice and Doug H having a break from all the lifting and work that was done on Wednesday night.
-
The club all cleaned up and ready for the New Track, 1.2tonnes Later.
-
Well all that's left to do now is start the New track keep watching.
-
Hans has cut out all the 4 x 2 for the Trestles, he's drilling holes for the long bolts to hold the Trestles upright.
-
Hans doing more work on the Trestles
-
Rob and Dion drilling the holes in the Jig for precision cutting of the Track
-
Dion Drilling holes in the jig
-
Doug and Rob cutting out the first corners of the Track
-
Doug, Rob and Dion working on the first corners.
-
Dion helping in keeping the dust low, while Rob Routers.
-
Franz and Hans sorting the Trestles while Doug and rob sorting out a shorter jig out for track cutting out.
-
Franz making Trestles











